Bathinda - Shri Ganganagar Passenger (UnReserved)
Bathinda Jn → Shri Ganganagar Jn
Timetable · 18 halts
| # | Station | Arrives | Departs | Halt | Platform | Day | Distance |
|---|---|---|---|---|---|---|---|
| 1 | Bathinda Jn BTI | Source | 07:25 | — | 3 | 1 | 0 km |
| 2 | Bahman Diwana BWX | 07:33 | 07:34 | 1 min | 1 | 1 | 9.6 km |
| 3 | Bulluana BHX | 07:44 | 07:45 | 1 min | 1 | 1 | 15.8 km |
| 4 | Giddarbaha GDB | 08:04 | 08:06 | 2 min | 1 | 1 | 27.6 km |
| 5 | Faqar Sar FSR | 08:15 | 08:16 | 1 min | 1 | 1 | 35.7 km |
| 6 | Malout MOT | 08:23 | 08:25 | 2 min | — | 1 | 43.7 km |
| 7 | Pakki PKK | 08:38 | 08:39 | 1 min | 1 | 1 | 58.3 km |
| 8 | Bahawal Basi BFE | 08:47 | 08:48 | 1 min | 1 | 1 | 65.3 km |
| 9 | Abohar Jn ABS | 08:55 | 08:57 | 2 min | — | 1 | 73.2 km |
| 10 | Kilanwali KLWL | 09:06 | 09:07 | 1 min | 1 | 1 | 80.8 km |
| 11 | Panj Kosi PJK | 09:14 | 09:15 | 1 min | 1 | 1 | 87.1 km |
| 12 | Bakayanwala BKWA | 09:22 | 09:23 | 1 min | 1 | 1 | 93.1 km |
| 13 | Kotha Pakki KTPK | 09:30 | 09:31 | 1 min | 1 | 1 | 96.9 km |
| 14 | Hindumalkote HMK | 09:37 | 09:38 | 1 min | 1 | 1 | 100.5 km |
| 15 | Orki ORKI | 09:45 | 09:46 | 1 min | 1 | 1 | 105.8 km |
| 16 | Fatuhi FTH | 09:55 | 09:56 | 1 min | 1 | 1 | 110.8 km |
| 17 | Mohanpura MOPR | 10:05 | 10:06 | 1 min | 1 | 1 | 120.4 km |
| 18 | Shri Ganganagar Jn SGNR | 10:25 | Destination | — | 3 | 1 | 126.2 km |
Other trains Bathinda Jn → Shri Ganganagar Jn
About Bathinda - Shri Ganganagar Passenger (UnReserved) (54755)
Bathinda - Shri Ganganagar Passenger (UnReserved) (train number 54755) is a train between Bathinda Jn and Shri Ganganagar Jn. It is a Passenger service of the NWR/North Western zone. The route is 126 km and takes about 3h. It has 18 scheduled halts. Bathinda - Shri Ganganagar Passenger (UnReserved) runs daily.
Questions about Bathinda - Shri Ganganagar Passenger (UnReserved)
What is the route of Bathinda - Shri Ganganagar Passenger (UnReserved)?
Bathinda - Shri Ganganagar Passenger (UnReserved) (54755) runs from Bathinda Jn to Shri Ganganagar Jn with 18 scheduled halts. Key stations include Bathinda Jn, Kilanwali and Shri Ganganagar Jn.
How long does Bathinda - Shri Ganganagar Passenger (UnReserved) take?
About 3h for 126 km.
On which days does Bathinda - Shri Ganganagar Passenger (UnReserved) run?
Bathinda - Shri Ganganagar Passenger (UnReserved) runs daily.
How can I check the live status of Bathinda - Shri Ganganagar Passenger (UnReserved)?
Use “Show live status” above or open the live running status page for 54755. It shows the current position, delay at each stop and the expected arrival at upcoming stations.