Shri Ganganagar - Bathinda Passenger (UnReserved)
Shri Ganganagar Jn → Bathinda Jn
Timetable · 18 halts
| # | Station | Arrives | Departs | Halt | Platform | Day | Distance |
|---|---|---|---|---|---|---|---|
| 1 | Shri Ganganagar Jn SGNR | Source | 06:35 | — | — | 1 | 0 km |
| 2 | Mohanpura MOPR | 06:42 | 06:43 | 1 min | 1 | 1 | 5.8 km |
| 3 | Fatuhi FTH | 06:52 | 06:53 | 1 min | 1 | 1 | 15.4 km |
| 4 | Orki ORKI | 06:59 | 07:00 | 1 min | 1 | 1 | 20.4 km |
| 5 | Hindumalkote HMK | 07:07 | 07:08 | 1 min | 1 | 1 | 25.7 km |
| 6 | Kotha Pakki KTPK | 07:14 | 07:15 | 1 min | 1 | 1 | 29.3 km |
| 7 | Bakayanwala BKWA | 07:21 | 07:22 | 1 min | 1 | 1 | 33.1 km |
| 8 | Panj Kosi PJK | 07:29 | 07:30 | 1 min | 1 | 1 | 39.1 km |
| 9 | Kilanwali KLWL | 07:37 | 07:38 | 1 min | 1 | 1 | 45.4 km |
| 10 | Abohar Jn ABS | 07:45 | 07:47 | 2 min | — | 1 | 53 km |
| 11 | Bahawal Basi BFE | 07:56 | 07:57 | 1 min | 1 | 1 | 61 km |
| 12 | Pakki PKK | 08:05 | 08:06 | 1 min | 1 | 1 | 67.9 km |
| 13 | Malout MOT | 08:18 | 08:20 | 2 min | — | 1 | 82.6 km |
| 14 | Faqar Sar FSR | 08:37 | 08:38 | 1 min | 1 | 1 | 90.6 km |
| 15 | Giddarbaha GDB | 08:45 | 08:47 | 2 min | 1 | 1 | 98.6 km |
| 16 | Bulluana BHX | 09:03 | 09:04 | 1 min | 1 | 1 | 110.4 km |
| 17 | Bahman Diwana BWX | 09:11 | 09:12 | 1 min | 1 | 1 | 116.6 km |
| 18 | Bathinda Jn BTI | 09:30 | Destination | — | — | 1 | 126.2 km |
Other trains Shri Ganganagar Jn → Bathinda Jn
About Shri Ganganagar - Bathinda Passenger (UnReserved) (54754)
Shri Ganganagar - Bathinda Passenger (UnReserved) (train number 54754) is a train between Shri Ganganagar Jn and Bathinda Jn. It is a Passenger service of the NWR/North Western zone. The route is 126 km and takes about 2h. It has 18 scheduled halts. Shri Ganganagar - Bathinda Passenger (UnReserved) runs daily.
Questions about Shri Ganganagar - Bathinda Passenger (UnReserved)
What is the route of Shri Ganganagar - Bathinda Passenger (UnReserved)?
Shri Ganganagar - Bathinda Passenger (UnReserved) (54754) runs from Shri Ganganagar Jn to Bathinda Jn with 18 scheduled halts. Key stations include Shri Ganganagar Jn, Abohar Jn and Bathinda Jn.
How long does Shri Ganganagar - Bathinda Passenger (UnReserved) take?
About 2h for 126 km.
On which days does Shri Ganganagar - Bathinda Passenger (UnReserved) run?
Shri Ganganagar - Bathinda Passenger (UnReserved) runs daily.
How can I check the live status of Shri Ganganagar - Bathinda Passenger (UnReserved)?
Use “Show live status” above or open the live running status page for 54754. It shows the current position, delay at each stop and the expected arrival at upcoming stations.